
The project is located in Gaoyou City, Jiangsu Province, the construction site is divided into: Yangzhou Bosideng clothing 5.28MW and Bosideng logistics 4.24MW, with a total area of 100,000 square meters, installed capacity of 9.52MW.

WeChat

Sina